Contract #: 18337 4/24/25 Dug down in grassy area next to driveway about 4’ and replaced section of clay pipe with 6” pvc, non sheer mission couplings, and a riser with a 6” cap for an outside cleanout. Bedded line in stone and backfilled after city approval. 4/30/25 Installed 5’ spot repair for section of clay tile that was broken.
We are lining the sewer from an outside clean out 20’ out to the city main the old clay tile had heavy root growth the roots can not grow into our seamless liner!