Responded to a piping repair service call. Descaled 8 feet of 6" galvanized pipe. Conducted spot repairs with a total of 8 feet of liner using epoxy resin, accessed from the overhead stack cleanout in the basement. The repair spanned from 6" PVC to 8" PVC, covering a section where a break occurred near the foundation wall.