2/24: Cleaned and measured in preparation for lining. 3/3: Lined sewer from open hole near stack just before family room to clean-out just past concrete entryway (approximately 60ft) 3/29 Spray epoxy coated 10’ of 4” cast iron pipe with a 3 mil thickness from toilet collar.