1-27-2023: lined 6” sewer from 6” clean out in front yard 40’ downstream to city main, started liner in 6” clay just downstream of clean out (no pvc on downstream side of clean out to start liner) and ended liner just before city main. Also installed (x2) 5’ spot repair liners upstream from 6” clean out staring in 4” pvc near flood control and ending in 6” pvc near clean out.
10-24-2022: Did a video inspection of the sewer from outside clean out to city main roots at multiple joints, went from outside clean out upstream to flood control valve, also went from basement open tee upstream of check valve near flood control tv’d back to catch basin under back deck, 4 tie ins on line.