9-6-2024: cleaned and measured sewer in preparation for lining. 9-13-2024 -Inserted a 6” liner through the existing outside clean-out extending downstream approximately 24 feet to just before the city main. -Inserted a 6” liner through the existing outside clean out extending upstream approximately 86ft near the house. -Re-instated 4 lateral connections tying into the line from the house by way of an internal robotic cutter.