Lined 4” sewer line approximately 55’ downstream from overhead cleanout in back room in basement ending prior to the tank outside. Reinstated tee connection from overhead cleanout behind bar. Lined 4” sewer line approximately 20’ downstream ending short of tee connection from the main line going to the tank. Lined the tee connection with epoxy tee liner.