Televised 200’ of sewer from floor clean out in yellow hallway to direct tie to manhole outside. 6” cast scaled with bottom of pipe which looks to be missing/channeled at about 60’-120’. We will send quote to line 200’ of 6” main from floor clean out to wye fitting at about 90’, also line from manhole back upstream to wye fitting about 100’.