-Inserted a 6” liner through the existing outside clean-out extending downstream approximately 70 feet to just before the city main. Reinstated 6” kitchen overhead connection. Inserted a 4-6” liner through the kitchen overhead clean out in the basement extending approximately 20’ ending prior to the main line that was just previously lined.