And we ran the new 2 inch flue liner connected all the PVC parts that we needed to. We didn’t run a combustion pipe we are just going to pull in questionnaire from the room. We already set the gas pressure the first time we were out there but we did test both high and low stage heating to make sure they were both working properly and didn’t trip any pressure switches. Everything seems to be fine and they should be ready for the winter.