Returned on day two to complete flus and return air. Ran flu and combustion out front of house with concentric kit, glued fittings down to furnace and configure flu and combustion through ceiling cavity. Cut in return air at basement stairs on exterior wall of return drop. Modified ductwork and sealed ductwork.