Replace dual capacitor to the main unit, install hard start kit and UV light on main floor and relocate both drain lines above grade. Return visit January 7, 2026 Replaced dual capacitor on the main floor heat pump and install installed compressor start assist kit on that unit as well. Installed UV light the blower compartment of the air handler to the main floor to treat biological growth. After installing the start assist kit, the compressor amperage dropped to 66 A on startup. Also, both condensate drain lines were relocated above grade. The second floor drain line was shortened by about 25 line feet and terminated just to the right of the back deck. There was an 18 inch vertical section that was completely removed as it was entirely compacted with rust and debris buildup. The second floor will be draining significantly better at this time. The main floor drain termination was relocated only about 4 inches above where the existing termination was in order to keep minimum pitch on