This estimate includes the repair of splicing and the the replacement of 2 existing switches in the 2nd floor hall bathroom. We have replaced the 2 existing switches in the second floor bathroom. In addition we have made panel corrections. Double tapped neutral wires and loose breaker termination corrected.