In summary I installed 2 ground rods then ran ground wire from them to where the seu cable is I installed a emergency disconnect and installed the line and load side seu cable and landed it in the emergency disconnect and supported the wires along the wall and have half the temp done with the bugs on one side and will complete it tomorrow when i do the panel I ran a uf 14-2 wire from the 4 gang switch box inside the home by the front door through the wall into the ceiling then drilled a hole outside and ran uf wire to a weather proof 8b box i installed. Then ran another wire from that box to another 8b box i installed. I drilled holes through the joists and ran my wires through them and i installed weather proof connectors for the uf wire. These boxes are for light fixtures the customer wants to install for the future I added a outlet in the basement for a computer next too the steps. I ran my wire behind the steps in a crawl space and will tie into a receptacle next to the pane