Remove the existing FPE panel and reinstall a new Leviton 150 amp, 20-space panel. All breakers will be matched to existing and labeled in accordance with their power. Pull permits for the scope of work with the municipality. We will return on the scheduled inspection date to remove the panel cover for the inspector and then return later in the day to reinstall it.