Running new wiring from the AC disconnect to the condenser unit to ensure a safe and reliable electrical connection. The work included properly sizing the conductors, securing them in protective conduit, and testing the circuit at both ends for correct voltage and operation. This upgrade improves efficiency and brings the system up to code standards.