In Lilburn, GA, I installed an EV charger for a client. After verifying the electrical panel’s capacity, I installed a Level 2 ChargePoint EV charger. I connected it to the existing 240V circuit, mounted the charger on the wall, and tested it by plugging in the vehicle to ensure everything was functioning correctly.