Marco B.

Marco B. Job Checkin

Troubleshoot and repair burnt up GFCI outlet in master bathroom feeding the other bathroom outlets

Troubleshoot and repair burnt up GFCI outlet in master bathroom feeding the other bathroom outlets Troubleshoot and repair burnt up GFCI outlet in master bathroom feeding the other bathroom outlets

Rey V.

Rey V. Job Checkin

Arrived on site, and the customer reported that the downstairs doorbell chime was not functioning properly. The customer believed the issue was due to the doorbell not communicating with the chime and requested replacement of the chime using a customer-supplied unit. The chime was replaced as requested. The customer was advised that a full diagnostic of the low-voltage circuit between the doorbell transformer and the chime would be required to properly identify the root cause; however, the customer declined further troubleshooting and elected to proceed only with the chime replacement. After installation, the doorbell still did not communicate with the chime. It was observed that the doorbell displayed a solid red light. Upon reviewing First Alert documentation, a solid red indicator light signifies a low battery condition, typically caused by the chime adapter not being installed during the initial setup. The customer was advised to contact First Alert for further evaluation and res

Arrived on site, and the customer reported that the downstairs doorbell chime was not functioning properly. The customer believed the issue was due to the doorbell not communicating with the chime and requested replacement of the chime using a customer-supplied unit. The chime was replaced as requested.

The customer was advised that a full diagnostic of the low-voltage circuit between the doorbell transformer and the chime would be required to properly identify the root cause; however, the customer declined further troubleshooting and elected to proceed only with the chime replacement.

After installation, the doorbell still did not communicate with the chime. It was observed that the doorbell displayed a solid red light. Upon reviewing First Alert documentation, a solid red indicator light signifies a low battery condition, typically caused by the chime adapter not being installed during the initial setup. The customer was advised to contact First Alert for further evaluation and res Arrived on site, and the customer reported that the downstairs doorbell chime was not functioning properly. The customer believed the issue was due to the doorbell not communicating with the chime and requested replacement of the chime using a customer-supplied unit. The chime was replaced as requested.

The customer was advised that a full diagnostic of the low-voltage circuit between the doorbell transformer and the chime would be required to properly identify the root cause; however, the customer declined further troubleshooting and elected to proceed only with the chime replacement.

After installation, the doorbell still did not communicate with the chime. It was observed that the doorbell displayed a solid red light. Upon reviewing First Alert documentation, a solid red indicator light signifies a low battery condition, typically caused by the chime adapter not being installed during the initial setup. The customer was advised to contact First Alert for further evaluation and res

Rey V.

Rey V. Job Checkin

Customer needs to order material also have someone come out to cut the countertop before work is completed

Customer needs to order material also have someone come out to cut the countertop before work is completed Customer needs to order material also have someone come out to cut the countertop before work is completed

Alex C.

Alex C. Job Checkin

Arrived to install a missing two gang blank coverplate confirmed with technician that it was missed during the last visit.

Arrived to install a missing two gang blank coverplate confirmed with technician that it was missed during the last visit. Arrived to install a missing two gang blank coverplate confirmed with technician that it was missed during the last visit.

Tyler B.

Tyler B. Job Checkin

1. Run conduit on outside of house with wire 2. Come off existing circuit for old jacuzzi 3. Replace jacuzzi breaker to gfci breaker 4. Install bidet outlet 5. Troubleshooting 2 plugs that aren’t working 6. Fix reverse polarity plug in garage beside panel 7. Install gfci for 2 circuits in garage (free) 8. Install 1 customer supplied switch in master closet (free) 9. Install single pole switch (free) 10. Perform panel rejuvenation on each main panel in garage - replace all circuit breakers, check all connections and correct any double tapped neutrals 11. Replace each 200 amp main breaker 12. Install new copper ground rod 13. Install whole home surge protector on each main panel in garage - 108k amps protection (lifetime warranty) *5 year warranty only everything we do* Performed troubleshoot pn garage outlets to find outside plug wiring burnt and broken, cut access hole on other side and made splices and replaced all other outlets on circuit power working properly. Replaced all b

1. Run conduit on outside of house with wire
2. Come off existing circuit for old jacuzzi 
3. Replace jacuzzi breaker to gfci breaker
4. Install bidet outlet 
5. Troubleshooting 2 plugs that aren’t working
6. Fix reverse polarity plug in garage beside panel 
7. Install gfci for 2 circuits in garage (free)
8. Install 1 customer supplied switch in master closet (free)
9. Install single pole switch (free)
10. Perform panel rejuvenation on each main panel in garage - replace all circuit breakers, check all connections and correct any double tapped neutrals 
11. Replace each 200 amp main breaker
12. Install new copper ground rod
13. Install whole home surge protector on each main panel in garage - 108k amps protection (lifetime warranty)

*5 year warranty only everything we do*

Performed troubleshoot pn garage outlets to find outside plug wiring burnt and broken, cut access hole on other side and made splices and replaced all other outlets on circuit power working properly.  Replaced all b 1. Run conduit on outside of house with wire
2. Come off existing circuit for old jacuzzi 
3. Replace jacuzzi breaker to gfci breaker
4. Install bidet outlet 
5. Troubleshooting 2 plugs that aren’t working
6. Fix reverse polarity plug in garage beside panel 
7. Install gfci for 2 circuits in garage (free)
8. Install 1 customer supplied switch in master closet (free)
9. Install single pole switch (free)
10. Perform panel rejuvenation on each main panel in garage - replace all circuit breakers, check all connections and correct any double tapped neutrals 
11. Replace each 200 amp main breaker
12. Install new copper ground rod
13. Install whole home surge protector on each main panel in garage - 108k amps protection (lifetime warranty)

*5 year warranty only everything we do*

Performed troubleshoot pn garage outlets to find outside plug wiring burnt and broken, cut access hole on other side and made splices and replaced all other outlets on circuit power working properly.  Replaced all b

James A.

James A. Job Checkin

-Replace master bath toilet with O.S. Smart toilet. -Electrical outlet needed for power supply. (Already sold). -hardware for flange adaption for skirted toilet. -If flange is damaged or rotten price for repairs will be presented at time of toilet removal. -Include haul off and disposal of old unit. Replace closet flange and bring up to proper height -5 year warranty on toptech furnished materials Replace electric water heater in attic: -Remove and dispose of existing water heater -Replace pan and reconnect to existing pan drain -Install electrical disconnect -Discharge t&p into pan -Install flood protection device -Install anode upgrade -Provide city permit and inspection -12 year warranty on parts and labor No warranty on Owner Furnished materials. Installed owner furnished smart toilet in master bathroom. Installed new flange for toilet in master bathroom. Installed 50 gallon electric water heater with state warranty extension kit and flood stop device in upstairs a

 

-Replace master bath toilet with O.S. Smart toilet. 
-Electrical outlet needed for power supply. (Already sold). 
-hardware for flange adaption for skirted toilet. 
-If flange is damaged or rotten price for repairs will be presented at time of toilet removal. 
-Include haul off and disposal of old unit. 

Replace closet flange and bring up to proper height
-5 year warranty on toptech furnished materials

Replace electric water heater in attic:
-Remove and dispose of existing water heater
-Replace pan and reconnect to existing pan drain 
-Install electrical disconnect 
-Discharge t&p into pan
-Install flood protection device
-Install anode upgrade
-Provide city permit and inspection
-12 year warranty on parts and labor 

No warranty on Owner Furnished materials. 


Installed owner furnished smart toilet in master bathroom. Installed new flange for toilet in master bathroom. Installed 50 gallon electric water heater with state warranty extension kit and flood stop device in upstairs a  

-Replace master bath toilet with O.S. Smart toilet. 
-Electrical outlet needed for power supply. (Already sold). 
-hardware for flange adaption for skirted toilet. 
-If flange is damaged or rotten price for repairs will be presented at time of toilet removal. 
-Include haul off and disposal of old unit. 

Replace closet flange and bring up to proper height
-5 year warranty on toptech furnished materials

Replace electric water heater in attic:
-Remove and dispose of existing water heater
-Replace pan and reconnect to existing pan drain 
-Install electrical disconnect 
-Discharge t&p into pan
-Install flood protection device
-Install anode upgrade
-Provide city permit and inspection
-12 year warranty on parts and labor 

No warranty on Owner Furnished materials. 


Installed owner furnished smart toilet in master bathroom. Installed new flange for toilet in master bathroom. Installed 50 gallon electric water heater with state warranty extension kit and flood stop device in upstairs a

Alex C.

Alex C. Job Checkin

Warranty pictures and expansion tank support Job complete.

Warranty pictures and expansion tank support 
  Job complete. Warranty pictures and expansion tank support 
  Job complete.

Johnathan P.

Johnathan P. Job Checkin

- Excavate around meter box and in front of box. - remove meter box and expose water line. - cut behind leaking shutoff and remove to the meter nipple. - install new pex piping , new meter nipple and new ss handle pex shutoff. - install pressure reducing valve in front of whole home shutoff and set to 75psi. - install valve box and pea gravel. - install new tee support and 2 gal expansion tank on water heater cold side. - test all work for leaks and function. - backfill , clean up tools and trash. - permit and inspection included. ** 5yr p+l warranty on work ** Production crew will be out wednesday to complete work

- Excavate around meter box and in front of box.
 - remove meter box and expose water line.
 - cut behind leaking shutoff and remove to the meter nipple.
 - install new pex piping , new meter nipple and new ss handle pex shutoff.
 - install pressure reducing valve in front of whole home shutoff and set to 75psi.
 - install valve box and pea gravel.
 - install new tee support and 2 gal expansion tank on water heater cold side.
 - test all work for leaks and function.
 - backfill , clean up tools and trash.
 - permit and inspection included.

** 5yr p+l warranty on work **

Production crew will be out wednesday to complete work - Excavate around meter box and in front of box.
 - remove meter box and expose water line.
 - cut behind leaking shutoff and remove to the meter nipple.
 - install new pex piping , new meter nipple and new ss handle pex shutoff.
 - install pressure reducing valve in front of whole home shutoff and set to 75psi.
 - install valve box and pea gravel.
 - install new tee support and 2 gal expansion tank on water heater cold side.
 - test all work for leaks and function.
 - backfill , clean up tools and trash.
 - permit and inspection included.

** 5yr p+l warranty on work **

Production crew will be out wednesday to complete work

Daniel S.

Daniel S. Job Checkin

- Replace 3 old corroded multi turn valves under kitchen sink with new 1/4 turn valves. -Replace tubular drainage under sink in order to correct active leak. -Replace leaking kitchen faucet with new unit. (Owner furnished). 5 year warranty on parts and labor. No warranty on owner furnished materials.

- Replace 3 old corroded multi turn valves under kitchen sink with new 1/4 turn valves. 
-Replace tubular drainage under sink in order to correct active leak. 
-Replace leaking kitchen faucet with new unit. (Owner furnished). 

5 year warranty on parts and labor. 
No warranty on owner furnished materials. - Replace 3 old corroded multi turn valves under kitchen sink with new 1/4 turn valves. 
-Replace tubular drainage under sink in order to correct active leak. 
-Replace leaking kitchen faucet with new unit. (Owner furnished). 

5 year warranty on parts and labor. 
No warranty on owner furnished materials.

Daniel S.

Daniel S. Job Checkin

Repaired water line


Daniel S.

Daniel S. Job Checkin

Repaired yard leak


Johnathan P.

Johnathan P. Job Checkin

Water repipe


Alex C.

Alex C. Job Checkin

Installed new electrical panel, whole house surge protection


Rey V.

Rey V. Job Checkin

Added Tesla charger


Alex C.

Alex C. Job Checkin

Installed new breaker