Even with a new hasp key the FireWorks installation was not without issue. The program would not install with the PC network adapter enabled. Yet it cannot connect to the ESTx main computer without the network adapter which then would not re-enable in normal Windows. Was able to enable it in Windows Safe mode so Luis could connect FireWorks with the ESTx computer. End result is the FireWorks is working again. Luis, as always, was professional and courteous.
Luis was unsuccessful in getting FireWorks installed on our standalone PC. Luis is a good technician, as well as courteous and professional. ASA should brief technicians on a site's particular requirements for installing FireWorks to minimize difficulties.
The technicians were very patient with the plant personnel, and communicated well to make sure the job was done safely. Did a good job explaining how the tests were to be performed and worked with the other contractors onsite to coordinate the work.
Luis addressed all issues found and accomodated all customer requests.
Fire Suppression and Portable Extinguishers Inspection Monthly Pro-Inert and CO2 Cylinder Gauge Check. Put in Building Reports. PO: C5686 Confirm with site. Must be scheduled ahead of time for cyber security protocol. Monthly safety inspection including Portable Fire Extinguishers, Emergency/Exit Lighting, Ladders, Eyewash Stations, and Pro-Inert/CO2 Cylinder Gauge Check. PO: C5686 BRC ID: 419366
Replaced Module that went bad on Unit 2. Upon further investigation found dead short on wire. Will need to trace or repull wire. 2 Proinert Bottles showing low pressure will need to replace.
CO2 Suppression, Clean Agent Suppression, and Alarm Systems Inspection Annual Inspection of CO2 Suppression Systems (6 systems) Unit 1-2 Shutdown from 10/8 - 10/19 Unit 5-6 Shutdown from 10/22 - 11/2 Unit 3-4 Shutdown from 11/5 - 11/9 Annual Inspection of Pro-Inert Suppression Systems (7 systems) Unit 1-2 Shutdown from 10/8 - 10/19 Unit 5-6 Shutdown from 10/22 - 11/2 Unit 3-4 Shutdown from 11/5 - 11/9 Annual Firework System Inspection (1 system) Inoperable Deficiency: Trouble Shot horn Strobe Trouble In Unit 2 and discovered that a module had been “blown”, refer to pictures. Need to replace SIGA -MCC1S modules. Possibly 2 modules.