Arrived to do inspections when said they would. Great customer service. Very easy to deal with and quick response.
Great customer service. Respond quickly and professionally to request for service.
Sean was polite, prompt and very easy to work with. Highly recommended.
Keep sending Jared and my life is easy. He's prompt, walks me through anything i need to know, and is very professional. Great work with the new guy as well.
Very easy to work with and schedule. Jared comes out, goes above and beyond to get the job done and not disrupt any work being done. I ask for him specifically.
3/11/24 Sent email regarding service DH Sprinkler Repair The tech will remove and replace the outdated water gauges. NFPA 25 (13.2.7.2) Gauges shall be replaced every 5 years Deficiency: Outdated water gauges x2
Sprinkler Inspection Annual Fire Sprinkler Inspection - QC Dept Bldg #3 (3 Wet Systems) Techs need to make sure all material and all deficiencies are noted to be properly quoted per the customer 3/11/24 Confirmed with Ron W. for 3/13/24 at 10:30am / Sent email regarding inspection DH 3/6/24MV Called Ron and left a vm to schedule Deficiency: Out dated dry sidewalls are due for testing. Only 4 total installed, just replace. Located in maintenance storage room across from control room for sterilization. Unable to determine lengths due to location. Recommend installing temporary hard piped sidewalls so dry heads can be measured and ordered . (4) 1 x 1/2 RCs (4) 1/2” 155 degree QR sidewalls with 401 escutcheons 12’ 1” pipe Small boom lift Deficiency: needed for repair of sprinkler heads outside control room (124) - 3/4 inch 286 degree tyco ty5151 (2) -1/2 chrome 155 degree pendant with bell escutcheon (for inside control room ) will need a 19 ft lift rental . Deficiency: All of th
Obstruction Investigation and Sprinkler Repair
3/12/24 Confirmed by Rob for 3/13/24 for 8:00am DH / Sent email regarding inspection DH 2/9/24MV Called Rob would like a call back 2/12 2/5/24MV Emailed Rob regarding inspection date 2/12, waiting on confirmation Sprinkler Inspection
2/29/24 Confirmed with Jeremy T for 3/6/24 DH 1/5/24 (EA) Jeremy requires an ISA to provide a PO - Do not schedule until PO provided by customer Sprinkler Inspection Quarterly Fire Sprinkler Inspection (4 Wet Systems)
2/29/24 Confirmed with Jeremy T. for 3/6/24 DH 1/5/24 (EA) Jeremy requires an ISA to provide a PO - Do not schedule until PO provided by customer Sprinkler Inspection Quarterly Fire Sprinkler Inspection (3 Wet Systems)