3/4/24 CF. DH COMMERCIAL FIRE PAPERWORK: The tech will remove and replace the outdated water gauges. NFPA 25 (13.2.7.2) Gauges shall be replaced every 5 years
1/4/24 Commercial Fire DH Sprinkler Inspection Annual Sprinkler Inspection ***COMMERCIAL FIRE PAPERWORK/WO'S REQUIRED*** Deficiency: Sprinkler system is due for gauge change. 1- sprinkler gauge
***Commercial Fire Paperwork Attached Sprinkler Inspection Annual Sprinkler Inspection
Corrected deficiency from recent inspection
Corrected deficiency from recent inspection Replaced back door extinguisher with New And Installed new bracket