Mark was very helpful, and handled our facility's problems competently.
3/26/24 Confirmed with Dan for 3/27/24 at 8:00am 3/11/24MV Dan would like cannot do the 13th due to mait repairs. He would like 3/20 in the afternoon 3/7/24MV Emailed Dan regarding inspection date 3/11, waiting on confirmation Sprinkler and Stand Pipe Inspection Annual Sprinkler Inspection Annual Standpipe Inspection (1) Deficiency: Standpipe piping is due for five-year internal obstruction investigation 2- 4” victaulic couplings Deficiency: system is due for five-year Hydro test department connection Deficiency: Sprinkler system is due for five year internal investigation of fire department, connection check valve 2- 4” victaulic couplings Deficiency: Fire sprinkler system, dry pendant heads are due for a replacement. 2- 286° adjustable chrome pendant 12 inches in length quick response Deficiency: Quick response sprinkler heads are due for testing for UL 4- 155° pendant quick response half-inch chrome Deficiency: Fire sprinkler system is due for five-year internal construction
8/31/23 Sent email regarding inspection. DH Sprinkler Inspection Quarterly Sprinkler Inspection
6/15/23 Jacob called to set up inspection before the end of June. DH Sprinkler Inspection Annual Fire Sprinkler System Inspection (1 wet system) 5yr Internal Due: 2024 FDC Hydro Due: 2024 Quarterly Fire Sprinkler Inspection (1 Wet System) Tech will install the missing ITV sign at April's inspection Deficiency: Missing ITV sign in oxygen room fixed 4/4/2023 RBallard
Sprinkler Inspection Annual Sprinkler Inspection Deficiency: Site is missing an ESC. Deficiency: All fire systems are due for gauge change a total of three.
10/10/22 Sent email regarding inspection DH Sprinkler Inspection Quarterly Fire Sprinkler Inspection (1 Wet System)