2710 Northridge Dr. Suite #F
Grand Rapids, MI 49544
1-800-968-2871

Our Top Cities


Job Locations
for sterling heights, mi


Map of Sterling Heights MI
Terrence  J.

Terrence J.


Job Checkin

4/4/24 Confirmed with Scot J. / yes that will be good. I'll be finishing up in a staff meeting by then. if you don't find a person in the front office, please text me at 586-996-4167. thanks Scot. DH   1/19/24MV Chad is ok with the 22nd 1/15/24MV Chad reached out looking for an inspectyion date week of 1/15, Chad confirmed 1/17 12/20/23MV Reached out to chad for inspection date 12/26 12/12/23MV Emailed Chad regarding inspection date 12/13, 12/13 does not work for chad Sprinkler and Antifreeze Loop Inspection Annual Fire Sprinkler Inspection (3 Wet, 1 Dry System) Full Flood Due: 2020 5-Year Internal Pipe: 2024 5-Year FDC Hydro: 2024 Annual Antifreeze Loop Inspection (1) Deficiency: Anti-freeze system due for gauge change. 1- sprinkler gauge Deficiency: Dry fire sprinkler system is due for gauge change. 2- sprinkler gauges Deficiency: Sprinkler system is due for fire department connection Hydro test. Deficiency: Sprinkler system is due for five year internal inspection, fire depar