4/14 Confirmed with Lori, in office km 4/9 LM and emailed Mark km Kitchen Suppression Inspection Semiannual Kitchen System Inspection Ansul R102-D6 (2)500 links (4)360 links (9)Nozzles Deficiency: Number of Systems failed : 1