confirmed with Gary for afternoon Industrial/Dry Chemical Suppression and Sprinkler Inspection
Sprinkler and Industrial/Dry Chemical Suppression Inspection Deficiency: 5 year internal inspections due on 5 systems Gauges were replaced only in 2023 per Gary 2 FDC are due for hydro test FDC hydro test 5 year internal inspections ( 5 systems) No Gauge replacement Check valves are at both risers 2’ 4” pipe for both buildings Gary said to possibly do cylinders for paint booth around this Thanksgiving Deficiency: 5 year internal inspections due on 5 systems Gauges were replaced only in 2023 per Gary 2 FDC are due for hydro test FDC hydro test 5 year internal inspections ( 5 systems) No Gauge replacement Check valves are at both risers 2’ 4” pipe for both buildings Paint booth Nozzles cover is missing on IDC-145 system Controls on drying system do not shutdown tripped ( IDC-145) Controls on IDC-170 do not shutdown when system is tripped Electrician needed for all controls to shutdown when systems trip Nozzle cap
Sprinkler and Industrial/Dry Chemical Suppression Inspection
Sprinkler and Industrial/Dry Chemical Suppression Inspection
Industrial/Dry Chemical Suppression and Sprinkler Inspection