198 W Highway 246
Buellton, CA 93427
(805) 691-9905

Job Locations
for goleta, ca


Map of Goleta CA
Torrey Y.

Torrey Y.


Job Checkin

Coast Plumbing Solutions will be using the main line cable to restore flow to the customers 4 inch orangeburg main sewer line. The customer has recently had another company install a new 2 way cleanout on the orangeburg line roughly 30-40’ from the main house. From that clean out to the obstruction that has caused the customers line to back up is roughly 190’. Once flow has been restored to the main line, CPS will inspect the line from the house to the city tie in which is roughly a 280’ run of old orangeburg pipe. CPS will expose the 4” sewer line roughly 180’ from the customers house, located in the neighbors front yard near the large tree and cut out roughly 4’ of failing orangeburg pipe. The section will be replaced using 4” abs pipe with a two way cleanout installed for future maintenance. The customer is aware that due to the condition of the line and the material of the pipe, there will be no warranty on the main sewer line. The customer is also aware that if the main line cable