Completed the electrical trim-out phase for a residential project. Installed device boxes at specified heights, securing them with proper extension rings. Pulled THHN conductors per circuit requirements through EMT conduit runs utilizing approved fittings. Terminated branch circuits in panels using anti-short bushings. Implemented GFCI/AFCI protection as mandated. Mounted fixtures level with secure box support. All work underwent rigorous inspection.