Completed the electrical trim-out phase for a home construction project in Rydal. Installed all device boxes, securely fastened with proper extension rings to maintain code-specified depths. Pulled THHN conductors through EMT conduit runs, applying derating factors and utilizing approved fittings. Terminated all branch circuits in panels with anti-short bushings. GFCI and AFCI protection circuits were implemented per NEC requirements. Fixtures were solidly mounted with box supports, and devices were plumb and level. All work underwent meticulous inspection to verify adherence to electrical safety standards before final energization.