Installed new plumbing under sink in a residential home
Added new gas line in a kitchen of a new construction home.
Set new tub suroound in a new construction home
Connecting the main water line to the well system
Ran new gas lines in crawlspace and stubbed them up in a new construction home, hooked up air compressor to test new lines, filled lines to 30 psi and let them sit for 30 mins to make sure there was new leaks, cleaned up work area
Ran gas line and then pressure tested gas line and then cleaned up all the fittings and pipe and garbage
Completed roughing in water lines and clean outs and sump pump
Completed roughing in water and drain lines in a new construction home. Added all clean outs, braced and stud guarded all pipe as well as installing a new sump pump.
Roughed in pex water lines in back to back baths
Roughed in drain pipes and radon and venting in a residential new construction home