Call complains of mold and Sandy buildup in toilet. Technician advises to add bleach into toilet tank, flush multiple times clear out any mold buildup inside of toilet bowl rim,
Provided estimate for running diagnostics and labor to install new parts.
This job had a clogged condensate line and the safety overflow switch was shutting it off the upstairs unit performed the condensation flush cleaned out the line for the water drain and the unit was working properly Both systems need maintenance recommend maintenance plan or at least a tuneup.
Monthly inspection Patient room #1 functioning as designed Patient Room #2 functioning as designed Water heater room- notice of corrosion on nipples of water heater inlet and outlet (recommend replacement of nipples) Mop sink functioning as designed Restroom-functioning as designed - toilet loose bolts and is rocking back and forth while in use. (Recommend immediate pull and reset on toilet) Lab Room - functioning as designed, flushed eye wash station. Pt Prep room- functioning as designed Bull pen- functioning as desinged, flushed eye wash station
Technician performed repair on 1 1/4” main with new shut off valve
Honoring the original agreement we will install a softner and swap out her magnsoft system. We will provide softening unit Client will pay for carbon tank to keep the quality control of the water. Technician will install both tanks, No labor charge or parts. Client will provide 2 bags of Salt.
Technician came out complaint of black debris/mis coloring of toilet. Technician ran regeneration of conditioner.to See if that helps. Technician went to inspect toilets notice rubber fill valve hose is leaving a film and black matching the debris and coloring of toilet stains recommend replacement of fill valves hoses.
Install temporary water heater on ground for temporary demo and reconstruction
Rang his ring door bell. And called him 3 to 4 times no anwser
Leak detection opened drywall at Copper Inlet on hot waters, heater side found pinhole leak on three-quarter inch copper repaired with coupling and new MIP
Crossover health, East Vail Restroom working as designed angle stops underneath lavatory sink has corrosion Lines flushed Tighten down toilet bolts, tighten seat down Water heater room during flush scene. Green deposits coming out. All ball valves working properly. Power Flushed Patient room one Woody Corrosion underneath angle stops Sink functioning as designed Flushed lines Patient room to Belair Functioning as design Flushed lines Lab Sink faucet working as designed All four angle stops underneath have corrosion Flushed lines Flushed eye wash station Bullpen Sink working as designed Flushed lines Flushed eye wash station PT room lavatory sink functioning as designed corrosion, underneath hot side angle stop Flushed lines
Fix the 3/4 hot 90 coming out of the water heater lin