Installation Package Includes: • Furnish and install stated equipment as well as all parts, materials and labor at or above manufactures specifications and local code requirements. • New Electrical Disconnect • New Electrical Whip/Power wire from disconnect/switch to new equipment • Proper Size Fuses • New Condenser Pad, level and square • New Gas flex and piping per specs & codes • New Safety Gas Shut-Off Valve New Flue pipe per specs & codes • Condensate drains, both primary & secondary including clean-out tee, trap and electronic safety switch. • Emergency Drain Pan installed under coil (attic installs) • Install manual dampers in all main ducts at plenum to assist in better air distribution (On purchase of ducting only & when accessible/ applicable). • Clean & Chemically Flush existing line-set • Pressure test all refrigerant connections & piping to insure the new system is free of any leaks. • Haul away all jobsite trash and old equipment • Sales Tax is included W
Came to customers house and was already cleared by husband
Customer request attempt to, restore flow rather than clean out installation due to cast iron galvanized ptrap Attemp to restore flow without guarantee or warranty Cut and repair waste for, attempt to restore flow thru laundry pipe
Garbage disposal replacement in pomona