Just finished a 30 pier job for Mr.Haro we ran in to some concrete cylinders and replaced them with our steel piers
Starting a new foundation for Mr. Haro, we will be replacing concrete piers with 30 of our steel piers.
Today we'll start stabilizing the pool at the Bartz Ranch apartments using 109 steel piers.
For the end of leasing office: Finished installing 59 steel piers for the Bartz Ranch leasing office today and lifted it 3 inches!
Corrected some uneven sidewalks for SSFCU. Proud to do commercial Poly Pro X projects!
Installed 53 piers to lift a duplex in Austin. You can see in the picture how much lifting was needed to stabilize the property.
Starting a new foundation for Mr. Deleon. We’ll be installing 16 steel piers.
We stabilized 37 power units, at a wind turbine farm in South Texas, with 148 steel piers. Great job the the crew!
Here's a foundation repair on a historical building at Ft. Sam. Such a privilege to have done these repairs!
Starting a new foundation repair for ms. Morrison replacing concrete piers. We’ll install 19 of our steel piers.
Finishing a project today for Mr. Heyward with some clean up. We installed 14 steel piers and stabilized his house. We had to dig around electrical lines and the sprinkler system, but this foundation repair was a success!