I removed old faucet and cleaned up surface area. With old faucet out of the way, I mounted new Wolverine brass one of the customer's choice. I tightened down faucet. I cut old valve had. I had to remove excursion in order to have enough stub out and faster new compression valve in its place. I was able to make enough room and properly install new compression shut off. With new valve and faucet in place, I attached new supply lines between the two. With everything set, I turned water back on. No leaks detected and everything working great. Area cleaned up.