Jeremy was on time and personable. Took the time to explain your policies, showed the work and the cause of issue with a camera, gave me 2 reasonably priced options and completed the work that day. My basement is dry and my drains are draining properly.
Install new 1000 Gallon Plastic Septic Tank Soil testing and Percolation test with Local health department to determine design criteria for a replacement Septic System
Inlet line is choked down to 1”. Jet main line for continued use while soil testing is performed for new code compliant septic systems
Install riser and new cover on the clean out of the septic tank.