318 Center Street
Lockport, NY 14094
716-946-3598

Job Locations
for avon, ny


Map of Avon NY
James D.

James D.


Job Checkin

Installed new iron filtration system for well water application. System includes 1.5 cu ft of catalytic media for iron/manganese removal and auto-backwashing valve. Plumbed with bypass for service access. Initial water test showed 4.8ppm iron, post-installation test shows non-detectable levels. Programmed backwash cycle for 2 AM twice weekly to minimize disruption. Explained system operation and maintenance requirements to owner. Should resolve staining issues throughout home. Standard 10-year warranty registered online.