Generator Installation: Dispatched to install a new standby generator for backup power. Selected proper location and verified clearance and ventilation requirements. Installed generator pad, positioned unit, and connected to existing transfer switch. Ran fuel line, connected electrical wiring to panel, and verified proper grounding. Performed initial startup, tested automatic transfer switch operation under simulated power outage, and confirmed generator starts, transfers, and runs safely under load.