Removed a broken piece of a shower extension arm and flush hot water faucet line, cleaned the pop up stopper
Bryant furnace tune up. Cedarburg, Wisconsin
Check toilet tank fill valve and replace the supply line
TRIPPED WET SWITCH- Sealed Water Leak & Dried Moisture from Wet Switch
AIREASE 90% GAS FURNACE TUNE UP+ NEW #35 + NEW 20x25x5 TRIPN FILTER + 5MFD CAPACITOR
Commercial restaurant with four roof top units. Not cooling well, needs maintenance on all four units.