Today I came to Inverleigh Montessori School to evaluate the sanitary sewer after a back up. Amanda has explained that the sewer backed up over the weekend and they had another company out to clear the line. The other company found internal breaks in the pipe allowing root intrusions that caused the back up. They also found a piece of pipe that appeared disconnected in the parking stall at the rear of the building. Clearview replaced that section of pipe 4 years ago and Amanda was concerned that there was a problem with the repair. Upon camera inspection I found the repair is in tact and in good condition. The 1.5-2’ section was connected with ferncos and wax wrap. This can give the appearance of a disconnected pipe but it is still connected and flowering properly. There is a 2 foot section in the building that does need to be excavated and replace. Amanda has asked for a quote to replace this section of piping plus a quote for ac systems in the upper most rooms of the building.