Arrived onsite to perform planned service System psi at 70 Lots of rust moving through system can be seen in clear waterlines provided option to add softening system to prevent irreversible damage Client isn’t interested at this time Installed front plate to water heater and showed client how to remove and install so that pilot can be checked