Today I came to Darren’s Cochrane home because he would like to have a central air conditioning system installed. Upon. Inspection of the home I found it will require a 3 ton cooling system. The furnace is high efficient and just repaired by Clearview last year and is working well. There is room on the existing electrical panel to accommodate the ac system. There is no indoor air quality system. Ac install difficulty level 3 Cut in new coil, adapted to existing furnace condensate. Cored hole and started on running high voltage. Breaker panel is on the other side of the basement. Original plan was to run the wire over the bathroom, through the closet and into the finishing ceiling. Joists run the wrong way to run wire over ceiling, there is a trunk line, but the bulkhead is too tight to it to run beside or on top of it. Talked to customer and decided to run conduit from the closet to the breaker panel. It will be exposed for a few feet, but it matches the wall and can be hidden late