New thermostat, re-install UV system in new air handler, replace supply and return duct plenums and seal all connections with mastic to prevent future air leaks, replace safety pan and rods and brackets, install two new float switches one in pan and one in the secondary, flush and pressure test copper line set, repair if necessary, install new filter drier, attic has attic light already, install new heat pump outside with code approved anchors and brackets, new insulation on copper outside, reuse disconnect box outside, all permits and inspections are included and attention to detail is paramount. Need 10ft A frame ladder for air handler install.