Materials added Arrived to install two new turbo capacitors and two Elite Uv Lights in each air handler. Once installed ensured each unit was cooling properly. Attic Ah has a 16° delta Temperature and closet AH has 21°. I replaced both filters for the customer. I did not clear the drain for the mini split due to the rain.