Pulled and replaced 1/2 hp well pump, Disposed of existing pump and wire, Replaced wire and tested connections, Disposed of old well tank, Replaced tank w/ new welltrol 44gal tank and tee bundle assembly, Plumbed in new tank tee to the existing house plumbing, Checked all connections and leak points, All good, no leaks. -JC / RG