This is my go to well and water company. They are fast friendly and do a fantastic job
Jet Pump to submersible pump conversion. - Excavate at the well head to install a 1" stainless steel pitless adapter. - Install a 1/2 HP 10 GPM 230V 2 wire SS submersible pump with new 160PSI black pipe and 12/2 flat wire/cable with a ground. - Install a new 12/2 wire in the lateral line conduit currently used with the 2 pipe jet pump - Remove and dispose of old jet pump. - Install new fittings as required to tie into the existing well tank
SP3 Filtersorb or a 48K softener install, TBD and both systems are on order or in stock.
You can expect results for the bacteria on 8/26. Your radon results will be available by 8/29. The remaining balance, including lead will be available around 9/5.
Arsenic Remediation / Twin Tank Redundant w/ 2 cubic feet of Metsorb media