New pad on exisitng pad, new anchors and brackets, new ductwork under the home, 3 new duct runs with mixing box, and one new return duct 14 inch, sealed with mastic and hung, keep nest thermostat, all permits and inspections are included. Upon arrival, meet and greet with customer get started tearing out old package unit and ductwork replace new ductwork 14 inch two mixing box 210s coming off to two supplies then 14 inch two new 14 inch cut into return floor. Everything mastic sealed new 2 1/2 ton straight cool unit on existing pad tie down four corners hook up 214 inch one supply one return mastic two unit put new disconnect on wall with six wire Going to disconnect six wire going from disconnect new low-voltage wire from thermostat to package unit to unit drain line with P-trap coming off unit unit is draining. Unit is running. Unit is complete.