Installed a new rooftop AC unit. Removed the old unit and prepared the roof for installation. Hoisted the new unit onto the roof and secured it in place. Connected electrical wiring and ductwork, ensuring proper alignment. Charged the system with R-410A refrigerant and tested for efficient operation. Verified that the unit was cooling effectively and inspected for any leaks.