Installed pitiless, raised casing, and connected lateral line.
Checked operation of 3hp dabs, water softener, pump, and well management system. Everything is in working order. See notes for recommendations.
Saw cut concrete floor, jack hammer and excavate to expose leaking lateral line. Repair line as required and backfill with sand and native soil mix and float concrete floor patch.
Replace existing 35GPM pump end with a 45GPM unit and install (2) 119 Gallon pressurized well tanks.
Well Storage, Pumping and Boosting Systems Installation