Excavate and repair lateral line. Sleeve if possible.
This is the YTD invoice for the water sampling conducted for DEP reporting
Locate and raise well head w/6" PVC. Install a new well cap.
installation of a neutralizer to neutralize the PH.
Installation of Chlorine Injector
Install new constant pressure system in yardley pa