The visit today was for a water test. While inspecting, we found that the water pipes needed to be replaced and that a crack was midway through the stack riser. The estimate will cover replacing the galvanized water pipes besides the 1/2” going through the wall and installing a carbon and water softener. It will also replace the sewer stack and attach the existing PVC to the new stack. The toilet flange will also be replaced. The original cast stack vent will remain in place.