2 system PM. cleaned treated and flushed drain lines, checked temperature split and charge, checked Amp draw and voltage on all start and run components. replaced upstairs 35/5 almost completely flat. unit would have went down at any time. Downstairs system is fully operational no problem found. upstairs system AHU needs to be replaced.