Installed Trane XR14 3 ton condenser and TEM6 3 ton Trane variable speed air handler. Installed supply registers, return registers, R8 wrapped metal ductwork, R8 flex, and a 1 inch filter and filter rack. Installed drain pan, float switch, drain line, lineset and thermostat wire. Had ductwork pressure tested and sealed with AeroSeal. Performed pressure test on the lineset and pulled a vacuum on it. Released the factory charge from the unit. Need to return in the spring to start and test the unit and add any additional refrigerant as needed.